Maritime Port / dashboard

demo · synthetic values
live

Maritime Port — operations twin

Crane motion · PPE compliance · yard dwell · mooring tension · safety events.
CCTV → 3D twin live feed

Container terminal — wide-angle quay view

Source feed driving crane utilization, PPE zone scoring, and yard-dwell analytics shown below. Looping demo footage.

Physical crane utilization
78%
+4% vs yesterday · 6 cranes monitored
PPE compliance rate
88%
5 zones · +1% vs last shift
Exclusion zone breaches
2
today · 2 open alerts
Avg truck yard dwell
3.1 hrs
exceeds 2h SLA

Crane motion analysis

physical state vs PLC reported (ghost-idle detection)
100% 75% 50% 25% 0% C1 78% C2 82% C3 41% C4 9% C5 84% C6 71%
physically active ghost idle (PLC active · camera idle) true idle

PPE compliance by zone

helmets · hi-vis · footwear (combined)
Berth 14 apron 93%
Crane block C 86%
Yard block E 79%
Gate 2 staging 97%
Berth 21 apron 81%

Truck yard dwell vs SLA

last 6 hours · target ≤ 2h
3.6h 2.7h 1.8h 0.9h 0h 2h SLA 10:00 11:00 12:00 13:00 14:00 15:00 now

Safety events

last 30 min
14:31 alert Crane C3 — operator inside swing radius Block C, bay 4 · auto-cleared 14:32
14:18 alert Reach stacker RS2 — proximity breach with TRK-4421 (1.4 m) Yard block E
14:02 warn PPE missed — worker on Berth 21 apron, hi-vis flagged Single-frame, low confidence
13:47 info Container stack height — Bay 12 row 3 reached 5 high Within compliance · monitor only
13:21 warn Mooring tension snap-risk — Line 5 stern Berth B11 · 3 workers nearby

Equipment dwell by type

trailers, chassis, empty containers — flagged if free time exceeded
TRL-4421 trailer free time exceeded
Yard row 1 · 69h dwell · limit 48h
CHAS-002 chassis free time exceeded
Yard row 1 · 32h dwell · limit 24h
CNT-5501 empty container free time exceeded
Yard row 2 (wrong slot) · 92h dwell · limit 48h
TRL-3301 trailer
Yard row 2 · 17h dwell
TRL-9931 trailer
Yard row 2 · 41h dwell
CHAS-007 chassis free time exceeded
Yard row 2 (wrong slot) · 63h dwell · limit 48h
TRL-8823 trailer
Yard row 3 · 11h dwell
CNT-9901 empty container free time exceeded
Yard row 3 (wrong slot) · 104h dwell · limit 48h

Mooring line tension zones

workers detected within snap-risk exclusion of tensioned lines
Line 1 — Bow
Berth B14
2 workers · 0.9 msnap risk
Line 2 — Bow spring
Berth B14
clear
Line 3 — Breast
Berth B21
1 worker · 2.0 mtoo close
Line 4 — Stern spring
Berth B21
clear
Line 5 — Stern
Berth B11
3 workers · 1.2 msnap risk
Line 6 — Stern
Berth B11
clear

Berth utilisation — camera-verified

camera occupancy vs ghost idle (equipment present, no vessel)
B11 MV Kestrel 82% occ.
B14 MV Pacific Star ghost idle 68% occ.
B18 Vacant ghost idle
B21 MV Horizon 94% occ.
B24 MV Atlantic ghost idle 61% occ.
occupied ghost idle idle

Container stack height compliance

unsafe stacking detected via 3D point cloud per block
100% 75% 50% 25% 0% Block A Block C Block E Block F
compliant non-compliant (unsafe height)

Trailer yard occupancy

slot-level — occupied, empty, or wrong asset detected
TRL
TRL
!
TRL
TRL
!
TRL
TRL
TRL
!
TRL
TRL
TRL
TRL
TRL
!
TRL
13 occupied 7 empty 4 wrong asset occupied empty wrong asset

24-hour container moves · per crane

camera-verified pick counts vs PLC reported · hourly bins
40 30 20 10 0 00 06 12 18 24 peak 38 moves · 11:00
fleet aggregate · 1,432 moves QC-03 · 298 moves QC-05 · 214 moves · 14% ghost-idle target 1,500 moves/24h · met 95%

Berth occupancy · last 24h

vessel ops per berth · color = vessel class · gap = empty berth
B11 B14 B18 B21 B24 MV Kestrel · 8.2h MV Egret · 6.0h MV Falcon · 5.3h Feeder Voyager · 9.3h ghost-idle 4.0h Feeder Arc · 5.7h Tanker Vela · 6.0h Tanker Lyra · 8.7h MV Horizon · 10.7h MV Polaris · 5.2h ghost-idle 6.7h MV Atlantic · 8.0h 00 06 12 18 24
container ship feeder tanker ghost-idle 5 berths · 78% camera-verified utilization · 10.7h ghost-idle today

Container stack height · block × row grid

color = compliance — green ≤ target · amber 1 above · red 2+ above
Block A · perimeter row
Block B
Block C · double-handled
Block D
Block E · NON-COMPLIANT cluster ↓
Block F · perimeter row
compliant (60 cells) 1 over (5 cells) 2+ over (7 cells) 91% blocks compliant · Block E needs audit

Operations performance · Six-Sigma view

illustrative · crane cycle consistency · PPE · stack compliance
4.1 σ
Workforce σ-level · Target 4.5σ
QC-05 drives variance — 14% ghost-idle vs 6.2% fleet average. QC-03 is the consistency benchmark (3.4 min cycle σ). Block E stack compliance flagged 12% non-conformant pieces.
QC-03 · top performer 5.1σ
Container moves (24h)298
Cycle time88s · σ 3.4s
Ghost-idle vs PLC3.1%
PPE compliance98%
QC-05 · watch list 3.0σ
Container moves (24h)214
Cycle time112s · σ 9.8s
Ghost-idle vs PLC14.2%
PPE compliance82%
QC-01 · 02 · 04 · 06 · fleet aggregate 4.4σ
Container moves (24h)920
Cycle time avg94s · σ 5.6s
Ghost-idle vs PLC6.2%
PPE compliance93%
Sigma level combines cycle-time consistency, PPE compliance and ghost-idle detection (vision sees idle when PLC reports working). Spec band = median ± 2·IQR. Synthetic numbers for demo purposes.

Operations metrics · today vs target

key process indicators · 24h rolling window
Process Capability (Cp)
1.18
↑ 7% vs yesterday
Cycle time σ
5.6 s
↓ 12% vs yesterday
Defect rate
2.8%
↑ 0.4 pp · stack non-conformance in Block E
On-time vessel ops
91%
Equipment availability
92%
Cp = (USL − LSL) ÷ (6σ) using cycle-time spec band. Defect rate counts containers exceeding upper spec or stack-height tolerance.

AI recommendations

operator advice from real-time signals
! Re-time QC-05 against PLC handshake 14.2% ghost-idle indicates operator pacing or sensor mismatch — recalibrate cycle counter High Impact
P Issue PPE checkpoint at Berth 14 apron entry 3 single-frame helmet flags in last 2h · low-confidence but recurring Medium
S Stack non-conformance in Block E 12 pieces above 5-high target · audit row 21 (camera Cam-E2) High Impact
M Schedule maintenance for RS-2421 Proximity breach 1.4 m flagged 6 min ago at Yard Block E — second event today Medium
T Truck dwell limit exceeded — Yard row 1 3 trailers over 48h limit · escalate to slot scheduler Medium
Document QC-03 operator process 88 s cycle · σ 3.4 s — extremely consistent · use as reference standard Low

Top improvement opportunities

impact vs effort matrix
OpportunityImpactEffort
Re-route trucks 11–13 around Block E congestion High Low
Camera-verified PPE portal at Berth 14 entry High Medium
Re-sequence stack moves to reduce double-handling in Block C High Medium
Cross-train operators on QC-05 (currently single-deep) Medium High
Add weather-shielded rest area near QC-04 zone Low High
Standardize mooring line spec across Berths 11 / 14 Medium Low

AI safety intelligence

spatial-vision detectors operating on the same feed
PPE detection
88%
helmet · vest · footwear
Loitering & intrusion
2
events flagged today
Slip & fall
0
last 24h
≤ 1.2s detection latency · 94% confidence threshold · synthetic values for demo purposes.